Project Area from 82 Street to 50 Street

Check out this map showing the proposed road changes.

Public Engagement Sessions - June 2019

The City held public engagement sessions on June 19 and 22, 2019. Feedback can still be shared online until July 6 to help us adjust the design of the future roadway network. We invite you to help us improve:

  • The criteria that will be used to evaluate the design options

  • Proposed paths and connections for those who bike and walk

  • How we’re proposing to accommodate vehicles where roads and alleys will be closed to Yellowhead Trail between 68 Street and 62 Street

Event Evaluation Form

Share your input online until July 6. Input received during Phase 2 engagement will help refine the preferred concept plan that will be shared in fall 2019.

Share Your Input

Project Update

During Phase 1 of the concept planning study, the project team met with area residents, commercial property and business owners, and community organizations, as well as those who drive, bike and walk through the area. We discussed impacts of the removal of traffic signals and the potential closure of 66 Street at Yellowhead Trail. We collected feedback and heard how important 66 Street is to local businesses and residents.

Your input helped us develop options for the removal of the traffic signals at Yellowhead Trail and 66 Street, balancing technical requirements for the freeway with the needs of the community, businesses and commuters.

While multiple design options were studied, three options, two of which maintain a north-south connection, will be further developed to determine the concept plan for the area.

Option 1

Partial closure with right turn onto Yellowhead Trail

see larger view and more details

Option 2

Partial interchange 66 Street flyover (overpass)

see larger view and more details

Option 3

Yellowhead Trail underpass at 66 Street: 66 Street at grade

see larger view and more details

Map Key

Phase 1 Public Engagement Report

As part of the public engagement process, we are committed to reporting back on how your input was collected and used.

Phase 1 Listen and Learn Engagement Report

About the Project Area

The City has launched a concept planning study for the removal of the signalized intersection at Yellowhead Trail and 66 Street and the closure of the nearby accesses to Yellowhead Trail.

The study will also:

  • Determine how these changes affect traffic operation of the road network in the study area

  • Provide new roadway network solutions

  • Review locations for future pedestrian and cyclist connectivity opportunities

A concept plan for the area surrounding 66 Street was completed in 2012, but did not include plans for the 66 Street intersection.

Where We Are Now

Concept planning for the roadways between 82 Street and 50 Street, including removal of the signalized intersection of Yellowhead Trail and 66 Street, is expected to be complete by the end of 2019.

Project Lifecycle Concept

Public Engagement

Engagement information for all of the Yellowhead Trail Freeway Conversion projects can be found at Public Engagement. This includes engagement opportunities and reports for projects that make up the conversion of Yellowhead Trail.

Yellowhead Trail Is Changing

Stay informed with program updates and opportunities to have your say in shaping the new Yellowhead Trail.

For More Information

Yellowhead Trail Freeway Conversion

Telephone

311

Email yellowhead@edmonton.ca