A lot grading inspector

General information about residential lot grading approvals.

Inspections and Approval Stages

Lot grading inspections and approvals occur at two stages: Rough Grade and Final Grade

Rough Grading

This stage occurs after a building is constructed and consists of shaping the lot, with clay or other equivalent material native to the site, to conform to the approved Lot Grading Plan. A properly rough graded lot provides a solid base and template to place the final grade material. Completion of this stage is the responsibility of the property owner, however, it is often completed by the developer or home builder.

Final Grading

This stage includes the placement of topsoil on top of the rough graded lot to conform to the approved Lot Grading Plan. This provides the final layer before landscaping materials are placed. Completion of this stage is the responsibility of the property owner, however, it may be completed by the developer or home builder.

Inspection Fees

Lot grading inspection fees are available in the 2023 Development Permit and Compliance Certificate fees