The Kinnaird Bridge, located on 82 Street, south of 112 Avenue and north of 111 Avenue, will be rehabilitated. Construction is anticipated to begin May 2023.

Project Update - April 2023

This work will require various lane closures and detours throughout the project area. Traffic will continue to flow north and southbound with turning lanes and pedestrian access will be maintained. One side of the bridge will be closed at a time with both directions of traffic routed to one side, allowing for one lane in each direction. 

112 Avenue to Stadium Road is a suggested alternative route for those who typically utilize this bridge. Latta Bridge on Jasper Avenue between 90 Street and 91 Street is being replaced and will remain closed until construction is completed. Both bridges are anticipated to reopen in the fall of 2023.  

Rehabilitation work on this bridge includes

  • Bridge deck, sidewalk and barrier repairs and upgrades
  • Regrading of the underneath bridge deck and strengthening piers
  • Painting bottom of piers and sidewalk supports
  • Landscaping: tree and shrub restoration and soil clean-up

Construction Bulletin - April 2023

About the Project

Kinnaird Bridge was originally constructed in 1932 and currently serves as an arterial roadway with 4 lanes of traffic. Kinnaird Bridge is located along 82 Street, south of 112 Avenue and north of 111 Avenue.

The bridge crosses Rat Creek, which features a mixed use trail providing further access to Rat Creek trails and the river valley.

A Condition Assessment and Preliminary Rehabilitation Strategy Report was completed in August 2019 for Kinnaird Bridge and recommended minor rehabilitation.