The Northeast Edmonton Road Project (NERP) is the replacement of roads which require special drainage enhancement due to soft subgrade conditions that exist in the northeast neighbourhoods of Ozerna, Mayliewan, Belle Rive and a small portion of Eaux Claires. During construction, access is limited and residents will be affected by parking restrictions. Prior to the start of work, a construction bulletin will be sent outlining the work to be done and parking restrictions.

Construction Update - Spring 2019

As part of the 2019 construction program, roadway construction will occur at the following locations. The bulletins include maps showing the scope of work.

2019 NERP Construction Bulletin - Mayliewan and Ozerna

2019 NERP Construction Bulletin - Mayliewan, Belle Rive and Eaux Claires

  • 160 Ave from 82 Street to 90 Street
  • 160 Ave from 82 Street to 78 Street
  • 164 Ave from 82 Street to 77 Street
  • 153 A Ave from 72A Street to 70 Street
  • West of 64 Street on 157 Avenue Cul-De-Sac
  • 157 Avenue from 81 Street to 78 Street
  • 81 Street from 157 Ave to 159 Avenue
  • 157 Avenue from 81 Street to 79 Street
  • 162 Avenue from 77 Street to West of 78 Street

Project History

Construction Update - Spring 2018

As part of the 2018 construction program, roadway construction took place at the following locations. Each bulletin includes a map showing the scope of work for the construction season.

Construction Bulletin 18-1503-01 - April 2018

  • Loop of 155 Avenue West of 59A Street
  • 157 Avenue Cul-De-Sac West of 64 Street
  • North of 156 Avenue loop of 61A Street to 157 Avenue to 61B Street
  • 62B Street Cul-De-Sac West of 156 Avenue
  • 63 Street Cul-De-Sac East and West of 156 Avenue

Construction Bulletin 18-1504-01 - April 2018

  • Ozerna Road from 163 Avenue to 165 Avenue
  • 155 Avenue Cul-De-Sac East and West of 54 Street
  • 156 Avenue Cul-De-Sac East and West of 54 Street
  • Loop East of 59A Street from 162 Avenue to 162B Ave
  • 162A Avenue Cul-De-Sac West of 59A Street
  • 162B Avenue Cul-De-Sac West of 59A Street
Canossa and Elsinore Open House - April 2017

The City held an Open House on April 20 to display and explain the proposed sub-drain installation and roadway reconstruction of areas in Canossa and Elsinore. This was an opportunity for residents to understand why the work was being completed and to discuss how construction affected them.

Displays
Canossa Project Area
Elsinore Project Area
Construction Photos

Open House - May 2016

The City held an open house on May 12 to display and explain the construction map, staging map, traffic detour map and pedestrian detour maps. This was also an opportunity to inform residents about the new temporary traffic signal, which was installed at the walkway located at 74 Street South of 158 Avenue and explain how this signal functions. Also, during construction the intersection of 158 Avenue and 78 Street was closed to all traffic.

Construction Locations:

  • 158 Avenue from 74 Street to 157 Avenue
  • 74 Street cul-de-sac North of 158 Avenue
  • 76 Street cul-de-sac North and South of 158 Avenue
  • 76A Street cul-de-sac North of 158 Avenue
  • 158 Avenue from 77 Street to 78 Street

For More Information

Clinton Mah

Telephone

780-423-5004

Email clinton.mah@edmonton.ca

Building Great Neighbourhoods

All additional inquiries or escalations can be directed to the Building Great Neighbourhoods team, or by calling 311.

Email buildinggreatneighbourhoods@edmonton.ca

End of page content. Please choose between the following five options:

Back to main menu Back to current page menu and content View current page breadcrumb Back to site search Continue to page footer content