TraxSafe for Motorists

Traffic controls are in place along the South LRT corridor to accommodate LRT operations and testing around the new Southgate and Century Park LRT Stations.
Traffic Controls
Be aware of traffic control changes at these intersections along the South LRT corridor.
Southgate to Century ParkLRT trains will operate along the median on 111 Street from 61 Avenue to 23 Avenue with stations at Southgate and Century Park. Intersection Details
|
Health Science, McKernan/Belgravia, South CampusLRT trains operate on the west side of 114 Street. Intersection Details
|
Traffic Signs
- USE EXTRA CAUTION WHEN MAKING TURNS AT INTERSECTIONS WHERE LRT OPERATES, DO NOT STOP ON TRACKS!
- Images of signs and details.

Transforming Edmonton
Twitter
Facebook
YouTube
RSS