Backfill at Back of Concrete Walks or Paved Lanes

To reduce water infiltration into the granular base of concrete walks and paved lanes, non-granular backfill must be placed to the top (surface) of the concrete or asphalt. This will enhance the long term performance of the walk or lane by minimizing water infiltration through the granular base.

The following diagrams and pictures illustrate the typical clay cap with sidewalk (for reference only):

Typical Clay Cap with Sidewalk at Rough Grade Design

Existing Clay Cap with Sidewalk at Rough Grade Stage

Typical Clay Cap with Sidewalk at Final Grade Design

Improper grading generates ponding during the rain

 

City of Edmonton Logo

Copyright © 2012, City of Edmonton.