St. Francis Xavier Construction Photo Gallery

Bleachers and Changerooms (83.05KB)

Bleachers and changeroom areas from the gym space.

Exterior - East Elevation (60.60KB)

SE corner of the facility.

East Wall (61.09KB)

View from street. Structural steel outlines the roofline of the building.

North East Wall (60.34KB)

Precast panels on East & North side. Structural steel underway.

Mechanical Room (86.56KB)

The mechanical room is prepared for pouring the slab.

Water Line Install (122.01KB)

Gym floor (foreground), reception, lobby, and main entrance.

West Stair Tower (92.72KB)

West stair tower to 2nd floor where spectator seating will be located.

East Stair (107.21KB)

Blocking is underway to form the east stair tower.

City of Edmonton Logo

Copyright © 2010, City of Edmonton.