Development, upgrades and improvements to Edmonton public transportation.

Edmontonians will begin to see more development, upgrades and improvements to Edmonton public transportation beginning in May, 2017 thanks to the Public Transit Infrastructure Fund (PTIF).

This fund holds approximately $300 million and is made of contributions from the Government of Canada, Government of Alberta and the City of Edmonton. It has allowed the City of Edmonton to put forward 46 infrastructure projects across Edmonton to improve the user experience when using Edmonton Transit Services and LRT.

For information on bus routes and bus stop changes during construction, visit takeETS.com/projects

LRT Station Improvements

Bay/Enterprise Square

Full floor tile replacement and LED lighting planned for 2018-2019.

Belvedere

LED lighting and platform warning tile upgrades planned for 2019.

Central

Platform ceiling replacement and LED lighting upgrades planned for 2019.

Century Park

LED lighting and platform warning tile upgrades planned for 2019.

Churchill

Planning and design for refurbishment of the Churchill LRT Station and 102 A  Entrance includes:

  • Design elements that increase safety and connectivity to the future Valley Line
  • Replace and repair outdated or damaged areas
  • Improve access, flow and accessibility allowing people to move safely and efficiently
  • Ensure the new design and components within the refurbished station are efficient to operate and maintain long-term
  • Rehabilitation of mechanical, electrical and ventilation systems
  • Exploring options for passenger comfort through a temperature control study

A schematic design for refurbishment of the existing Churchill LRT Station and 102 A Avenue Entrance will be complete in Fall 2018.

Note: Construction for this project is not yet funded. The City will bring forward the completed schematic design plans to request funding required for final detailed design and construction. A timeline for construction has not been set.

 

Clareview

LED lighting and platform warning tile upgrades planned for 2019.

Coliseum
LED lighting and platform warning tile upgrades planned for 2018.

Coliseum LRT Station Refurbishment (Design only)

Planning and design for refurbishment of the Coliseum LRT Station and Transit Centre includes:

  • Design elements that increase safety and connectivity
  • Replace and repair outdated or damaged areas
  • Improve access, flow and accessibility to ensure the LRT station and transit centre are connected, allowing people to move safely and efficiently
  • Ensure the new design and components within the refurbished station are efficient to operate and maintain long-term
  • Incorporate land-use integration with the Coliseum Station Area Redevelopment Plan (ARP) which is currently under development

A schematic design for refurbishment of the existing Coliseum LRT Station and Transit Centre will be complete in Spring 2018.

Note: Construction for this project is not yet funded. The City will bring forward the completed schematic design plans to request funding required for final detailed design and construction. A timeline for construction has not been set.

 

Corona

Concourse ceiling replacement and LED lighting upgrades planned for 2019.

Grandin

LED lighting upgrade planned for 2018.

Health Sciences/Jubilee

LED lighting and platform warning tile upgrades planned for 2019.

Kingsway

Platform warning tile upgrades planned for 2019.

MacEwan

Platform warning tile upgrades planned for 2019.

McKernan/Belgravia

LED lighting and platform warning tile upgrades planned for 2019.

South Campus/Fort Edmonton Park

LED lighting and platform warning tile upgrades planned for 2019.

Southgate

LED lighting and platform warning tile upgrades planned for 2019.

Stadium
LED lighting upgrade planned for 2018.

Stadium LRT Station Refurbishment (Design only)

Planning and design for refurbishment of the Stadium LRT Station includes:

  • Design elements that increase safety and connectivity
  • Improve access, flow and accessibility to ensure the LRT station and transit centre are connected, allowing people to move safely and efficiently
  • Ensure the new design and components within the refurbished station are efficient to operate and maintain long-term
  • Replace and repair outdated or damaged areas in the existing station. Please note that possible relocation of the Stadium LRT Station is not included in this refurbishment project
  • Incorporate land-use integration with the Stadium Station Area Redevelopment Plan (ARP) which is currently under development

A schematic design for the refurbishment of Stadium LRT Station will be complete in spring 2018.

Note: Construction for this project is not yet funded. The City will bring forward the completed schematic design plans to request funding required for the final detailed design and construction. A timeline for construction has not been set.

University

LED lighting upgrade planned for 2018.

Transit Centre Improvements

Belvedere Transit Centre

The Belvedere Transit Centre (6120-129 Avenue) is a heated building on the east side of the bus lanes, where transit riders wait for the bus. The existing building will be removed and a new building will be constructed in the same area. The existing building will be replaced with a new, larger building with improved amenities and viewing area.

Feedback gathered during public engagement contributed to the final improvement designs.

What We Heard - Belvedere Transit Centre Improvements

Construction began in December 2017. The new transit centre is expected to open in Fall 2018. Construction will not affect bus or LRT services. Please respect all site signage and stay out of the construction zone.

Transit users can wait for their bus inside the LRT station.

View images of the future transit centre.

Capilano

Replacement of the Capilano busway is complete.

Castle Downs

The Castle Downs Transit Centre (153 Ave & Castle Downs Road) building will be replaced by a new, larger building with improved amenities and viewing area.

Renewal of the transit centre will include upgrades to the building systems such as heating, electrical and mechanical systems. It will improve overall customer experience, safety, security, access and mobility.

The new design will also address passenger capacity, technology upgrades, architectural aesthetics, site landscaping and operational efficiencies.

Construction began on March 21, 2018 and is expected to finish in fall 2018. Replacement of the Castle Downs busway is complete.

Century Park

LED lighting upgrade planned for Fall 2018.

Clareview East

LED lighting upgrade planned for 2018.

Clareview West

LED lighting upgrade planned for 2018.

Coliseum

Replacement of the Coliseum busway is complete.

Eaux Claires

LED lighting upgrade planned for 2018.

Jasper Place Transit Centre

Jasper Place Transit Centre is getting a new look. The existing bus shelter will be removed and new heated waiting areas will be constructed on a wider platform. The waiting areas will accommodate more people more comfortably than the old shelter. The old brick building on the northwest corner of the transit centre will be removed and a new, smaller operations building will take its place with some landscaping, bike parking and seating.

Feedback gathered during public engagement contributed to the final improvement designs.

What We Heard - Jasper Place Transit Centre Improvements

Construction began in February 2018 and is scheduled to finish in fall 2018.

Replacement of the Jasper Place busway is complete. Please respect all site signage and stay out of the construction zone.

View images of the future transit centre.

Kingsway

LED lighting upgrade planned for 2018.

Lakewood

Replacement of the Lakewood busway is complete.

Leger

LED lighting upgrade planned for 2018.

Lewis Farms

LED lighting upgrade planned for 2018.

Meadowlark

Replacement of the Meadowlark busway is complete.

Meadows

LED lighting upgrade planned for 2018.

Northgate

Replacement of the Northgate busway is complete.

South Campus/Fort Edmonton Park

LED lighting upgrade planned for 2018.

Southgate

LED lighting upgrade planned for 2018.

Stadium

Replacement of the Stadium busway is complete.

West Edmonton Mall

Replacement of the West Edmonton Mall busway is complete.

Westmount

Replacement of the Westmount busway is complete.

Future Transit Centres

For More Information

Office of Infrastructure & Funding Strategy

5th Floor, Chancery Hall
3 Sir Winston Churchill Square
Edmonton, AB
T5J 2C3

Telephone 780-496-5304
Fax 780-420-4884