Photo Gallery

Recreation Centre: (120.92KB)

South entrance view from the second floor

Arena: (81.89KB)

Rink D refrigeration floor preparation - Sep/10

Arena: (91.98KB)

Exterior view of Rink D siding installation and parking lot asphalt - Sep/10

Recreation Centre: (116.70KB)

Exterior view of south entrance - Sep/10

Arena: (93.57KB)

Forming and pouring of exterior concrete plinth - Sep/10

Arena: (108.24KB)

Installation of refrigeration lines in Rink C - Sep/10

Arena: (98.53KB)

Installation of overhead lighting in Rink A - Sep/10

Aquatic Centre: (87.95KB)

5 metre diving platform and stairs poured - Aug/10

Arena: (115.05KB)

Exterior Siding Application to Rink D - July 20/10

Aquatic Centre: (79.09KB)

View from the Second Floor - July 20/10

Flexi Hall: (89.52KB)

Structural Steel Ceiling Support Installation - July 20/10

Tot Pool (98.68KB)

Tile Application - July 20/10

Indoor Playground (108.78KB)

Ceiling Paint Application - July 20/10

Fitness Centre (115.73KB)

Structural Tree Paint Application - May 13/10

Arena Complex (103.43KB)

Structural Steel Erection North View - May 13/10

Leisure Pool (76.03KB)

Tile Application - May 13/10

Family Change Room (75.67KB)

Accessible Shower - May 13/10

Aquatic Centre: (109.87KB)

Exterior Siding Application - May 13/10

Aerial Photo (107.71KB)

May 17/10

Arena (74.66KB)

Rink #1 Spectator Seating Concrete Formwork - April 6/10

Recreation Complex (45.04KB)

West View from Leger Road - March 30/10

Aquatic Centre (47.66KB)

53m Pool Tile Application - March 23/10

(46.64KB)

Whirlpool Tile Application - March 9/10

Flexi Hall (56.34KB)

Exterior Metal Siding Installation - March 9/10

Arena (75.46KB)

Under Slab Heating Line Installation

Aquatic Centre: 53m Pool (63.78KB)

Concrete test and roof paint application - January 26/10

Main Floor Change Room (34.80KB)

Floor Tile Application - January 19/10

Arena (110.58KB)

Structural Steel Erection over Pad 1 - Dec 1/09

South Parking Lot (66.98KB)

Asphalt, Curbs, Gutters and Lighting Installed - Nov 2/09

South Entrance (102.64KB)

Exterior Tinderstone Installation - Nov 2 2/09

Arena (62.75KB)

Construction of Dressing Rooms between Pad 1 & 2 - Sept 29/09

Leisure/Wave Pool (79.76KB)

Concrete Floor Poured - Sept 29/09

Aquatic Centre (76.58KB)

Exterior Drywall Application - Sept 15/09

Leisure/Wave Pool (120.38KB)

Slab Reinforcing Prior to Concrete Pour - Sept 15/09

Recreation Complex (70.99KB)

Structural Steel Framing of West Entry - Sept 15/09

Arena Complex (149.59KB)

Refrigeration Header Pipe Installation - Sept 15

Arena Complex (68.57KB)

Concrete Finishing - Sept 15/09

Arena Complex (93.06KB)

Concrete Slab Work for Ice Rinks 1 & 2 - Sept 8/09

Arena Complex (61.37KB)

Dressing Room Concrete Formwork - Sept 8/09

Arena Complex (149.28KB)

Refrigeration Header Pipe Installation - Aug 31/09

Arena Complex (79.15KB)

Concrete Formwork and Insulation - May 20/09

SCRC - Aerial View (77.22KB)

West Entrance (164.31KB)

Aug 19/09: Structural Steel Installation

South Entrance (74.53KB)

Aug 19/09: Canopy Installation and Laying of Drop Off Loop Asphalt

Aquatic Centre (62.10KB)

July 28/09: Filtration Tanks

Teach Pool (98.45KB)

July 28/09: Foundation Work

Mezzanine Level (84.73KB)

July 28/09: Concrete Slab Poured

Family Change Room (73.19KB)

July 28/09: Mechanical, Electrical and Concrete Block Work

SCRC South View (53.05KB)

July 28/09: View from Leger Road

53m Pool (71.77KB)

July 21/09: Pool Deck Concrete Poured

Drop-Off Loop (60.67KB)

July 21/09: Site Work

Aquatic Centre (115.62KB)

July 10/09: Lazy River Foundation Work

South Entrance (109.98KB)

July 10/09 Mezzanine Slab Concrete Pour

Aquatic Centre (69.28KB)

July 10/09: Structural Steel Installation

Teach Pool (69.28KB)

June 16/09: Mechanical Rough-in Prior to Concrete Placement

Amphitheatre (87.58KB)

June 16/09: Formwork in Preparation for Concrete Pour

Drop Off Loop (124.45KB)

June 16/09: Excavation Work Commences

Aquatic Centre (116.55KB)

June 16/09: Leisure/Wave Pool Structural Steel Erection

Main Floor Change Rooms (161.00KB)

June 16/09: Under Slab Plumbing Installation

53m Multi-Purpose Pool (53.12KB)

May 26/09: Structural Framework in Progress

Food Service Tenant Spaces (68.27KB)

May 26/09: Preparing for Structural Slab Pour

Social Heart (81.17KB)

May 26/09: Preparing for the Structural Slab Pour

Site Civil Work (75.32KB)

May 26/09: Drainage Pipe Installation

53m Multi-Purpose Pool (58.40KB)

May 20/09: Prepping for the Adjustable Floor Installation

Leisure/ Wave Pool (77.52KB)

May 20/09: Wave Generator Chamber Wall Forming

Whirl Pool (54.54KB)

May 20/09: Concrete Basin with Pool Fittings Installed

Recreation Centre Structural Framework (38.00KB)

May 20/09: 53m Multi-Purpose Pool Framing in Place

2nd Floor Mezzanine (85.94KB)

May 12/09: Walking/Jogging Track and Social Heart Structural Framework

Flexi Hall (42.65KB)

May 12/09: Interior View with Structural Slab Poured

Flexi Hall (38.10KB)

May 12/09: Masonry and Steel Deck Installed, Roofing to Commence

Teach Pool (68.75KB)

May 12/09: Mechanical Installation Prior to Concrete Placement

Flexi Hall & Social Heart (39.83KB)

May 12/09: Structural Framework Progressing

Flexihall (81.02KB)

Mar 31/09: North view - Structural framing

Wave/Leisure Pool (89.69KB)

Mar 31/09: Reinforcing steel walls of the lazy river

Multi-Purpose Pool (71.48KB)

Mar 31/09: Forming pool basin walls with underwater lights

Flexihall (101.00KB)

Mar 31/09: Preparation for Concrete Floor Placement

Flexihall (79.24KB)

Mar 31/09: Applying roof deck and masonry wall installation

Flexihall (111.68KB)

Mar 17/09 View of Flexihall from future drop-off loop.

Multi-Purpose Pool (59.30KB)

Mar 3/09: View of the 53 pool with flexihall in the background

Flexihall (96.21KB)

Feb 17/09: Flexihall structural steel installation

Whirlpool (100.80KB)

Feb 17/09: Reinforcing steel associated with the whirlpool

Flexihall Roof (62.59KB)

Feb 6/09: First section of the roof structure being placed

Pool Formwork (62.82KB)

Feb 3/09: Concrete formwork for teach and wave pool

Changerooms (89.78KB)

Feb 3/09: Main floor changerooms concrete floor

Wave Generator Wall (55.10KB)

Feb 3/09: Wave generator wall in leisure/wave pool

Multi-Purpose Pool (59.06KB)

Jan/09: Excavation and forming of the foundation.

Lower Mechanical Room Walls (122.86KB)

Dec/08

Pool Mechanical Room (105.91KB)

Oct 28/08

Concrete Grade Beam Placement (84.80KB)

Oct 28/08

Elevator Oil Separator and Sump (154.43KB)

Oct 28/08

Concrete Floor (127.13KB)

Oct 28/08: Lower mechanical room, concrete floor placement

Pile Cap Installation (91.32KB)

Oct 28/08

Pool Basement (63.24KB)

Sep 30/08: Excavation in preparation for pile installation

Flexihall (47.07KB)

Sep 30/08: Concrete forming for exterior wall and storage

Pool Basement (60.62KB)

Aug 27/08: Foundation excavation work

Pile Installation (54.19KB)

Aug 27/08